Air conditioning assembly
The line body is divided into main line and auxiliary line. The main line mainly realizes the online and semi-automatic assembly of air conditioning, assembly performance test (blower current, voltage detection, wind speed detection, vibration and noise detection), robot air conditioning appearance detection, etc. Auxiliary lines need to complete the pre-installation of parts, automatic oiling of motion mechanism, automatic oiling of damper, etc.